Job References by Category

Selected Projects

Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road - Section between HKSAR Boundary and Scenic Hill
 
Shatin to Central Link (SCL) C1121 - NSL Cross Harbour Tunnels
 
Central Wan Chai Bypass - Tunnel (North Point Section) and Island Eastern Corridor Link
 
Route 8 - Ngong Shuen Chau Viaduct, Hong Kong
 
Construction of Road T7 - Ma On Shan, Hong Kong
 
Construction of Station EW30 and Viaducts for Tuas West Extension, Singapore
 
Construction of Station EW31 and Viaducts for Tuas West Extension, Singapore
 
C1590- Jurong East Modification Project, Singapore
 
Proposed Boardwalk From Vivocity To Sentosa Island, Singapore
 
Access Road Connecting From International Business Park to Boon Lay Way
 
Design and Construction of Eco-bridge across BKE linking Nature Reserves
 
Widening of Keppel Viaduct
 
Shenzhen Western Corridor - Cable Stayed Bridge, Hong Kong
 
TsingYi North Coastal Road, Hong Kong
 
Sutong Bridge (Contracts B2 & D1), Jiangsu, China
 
Guangzhou Metro Route 4, Guangdong, China (Contract Nos. 1, 2 & 4)
 
Guangzhou Metro Route 14 - Phase 1, Guangdong, China (Contract Nos 6 & 7)
 
Shanghai - Chongming Bridge (Contract B6), China
 
Can Tho Bridge (Contract Package 2), Vietnam
 
Kuwait Boubyan Island Seaport, Phase 1, Stage 1 Road, Bridge & Soil Treatment
 

 

  TsingYi North Coastal Road, Hong Kong

 



Project Background

Project Client:Highways Department, Hong Kong
Contractor:Gammon Construction
Period:1998 - 2000


Services provided by YWL


YWL Engineering (in association with Lambeth) provided the alternative design of the permanent structure which consisted mainly of three precast segmental bridges and a number of earth retaining structures; the construction engineering services associated with segment casting and erection e.g. shop drawings, design for girder-deck interaction and construction methods.