Revitalisasi Jembatan Semanggi, Jakarta, Indonesia

Location:

Indonesia

Project Client:

PT Mitra Panca Persada

Contractor:

PT Wijaya Karya (Persero) Tbk. (main contractor); PT Tensindo Kreasi Nusantara (specialist sub-contractor)

Period:

Apr 2016 - Jul 2017

Construction Cost:

Approx. SGD 47M (USD 34M)

Services Provided

  • Independent checking engineers services (IPC) for bridge permanent works
  • Geometry control for segment casting and erection
  • Construction method & major temporary works design
  • Design and supply of segment lifters
  • Construction stage stress check on the permanent works
  • On-site management and construction supervision supports

Project Background

The proposed Semanggi interchange consists of two elevated ramps, which are built with tight horizontal radius and over the existing live traffic.  Each ramp is approximately 540m long with a minimum horizontal radius of 80m only and constructed by precast segmental method.