- Design of vehicular bridge
- Design of elevated park connector and pedestrian underpass structure
- Modification and extension of existing park connector
- Structural assessment and retrofitting of disused railway bridge
- Design of at-grade drainage system
- Design of soft ground treatment
ER358 – Access Road Connecting from International Business Park to Boon Lay Way, Singapore
Location:
Singapore
Project Client:
Land Transport Authority of Singapore
Contractor:
Eng Lee Engineering Pte Ltd
Period:
Sep 2010 – Mar 2013
Construction Cost:
SGD 19.8M (USD 15.6M)
Services Provided
Project Background
The works under Contract ER358 involves the construction of approximately 1km of a dual 2-lane access road connecting International Business Park and Boon Lay Way, 0.5km of elevated park connector and improvement works to park connectors along Sungei Pandan.