Project Background
The Works under Contract C1590 comprise the design,
construction and completion of an aboveground platform station
extension adjacent to the existing Jurong East MRT Station and a route
length of 1.65km (total length 2.5km) viaduct, including a special
superstructure spanning across N-S line, the ancillary structures and
external works.
The three-storey platform extension is approximately 150
m long and 20 m wide. Addition and alteration (A/A) works is carried
out to the link the entire first floor of the existing MRT station and
provide a new open plaza at east side.
The northbound and southbound viaducts stretch from the
platform extension and merges with the viaduct supporting the
northbound and southbound tracks of the existing N-S Line in the north.
The eastbound viaduct extends southeast from the platform extension to
merge with the viaduct supporting the eastbound track of the existing
E-W.
Project Client:
Land Transport Authority of Singapore
Contractor: Sato
Kogyo (S) Pte Ltd
Period: 2008
- 2010
Construction Cost:
S$ 127m
Services
provided by YWL
1、Modification of viaduct alignment to suit the site condition
2、Viaduct civil and structural design
3、 Station civil and structural design
4、Temporary protection frame design
5、Design
and supply of precast segment moulds
6、
Geometry control for segment casting and erection
7、
Construction engineering support